How Long Does a Ship from China to Poland Take and What Affects the Transit Time
A ship from China usually takes 35 to 50 days to reach Poland. Sea freight from China to Europe through the Suez Canal takes about 30-35 days, and the route around Africa, which most carriers have chosen since 2024, adds 10-14 days. On top of that come collection from the producer, waiting for space on the vessel, transhipment in a European port, customs clearance and delivery to the consignee. The whole sea freight from China, counted from the factory to a warehouse in Poland, therefore usually takes 6-9 weeks. Below we break this time down into stages and show where an importer can realistically shorten it.
How long sea freight from China to Poland takes
This question needs two numbers. The first is the voyage time that carriers publish in their schedules. The second is the delivery time, i.e. the period from handing the goods to the carrier to unloading at the consignee. For an importer the second one counts, because sales and stock planning depend on it. The table shows the stages it is made of.
China is one of Poland’s most important trading partners, and most goods from China reach Poland by sea. A container ship is slower than a lorry, but for heavy and bulky cargo it wins on the cost of freight from China per tonne. How long sea freight takes, however, depends on more than the voyage itself.
| Stage | Typical time | What it depends on |
|---|---|---|
| Collection from the producer and delivery to the quay | 2-7 days | distance of the factory, readiness of the order |
| Export formalities and waiting for the sailing | 3-10 days | cut-off date, availability of space |
| Ocean voyage to Northern Europe | 30-45 days | route via Suez or around Africa, number of port calls |
| Transhipment and feeder voyage to the Baltic | 3-10 days | place of transhipment, feeder vessel schedule |
| Import declaration in Poland | 1-3 days | complete documents, possible inspection |
| Delivery to the consignee | 1-3 days | consignee’s location, availability of a truck |
Swipe the table sideways to see all columns.
Added together, this gives roughly 40 to 75 days. The shorter end applies to a full container shipped from a major port in southern China with no delays on the way. The longer end applies to groupage, the season before Chinese New Year or a route with several transhipments. The average sea freight time for a full container is in practice about 7 weeks, and the ship is at sea for most of it.
Where cargo from China to Europe sails from and to
Most goods from China leave through the ports of Shanghai, Ningbo, Shenzhen (Yantian), Qingdao and Xiamen. The port of loading depends on where the supplier is. A producer in Fujian province, where stone processing is concentrated, will ship through Xiamen, and a factory near Shanghai through Shanghai or Ningbo. Trucking goods across half the country just to get a cheaper rate often eats up the saving.
On the Polish side, direct calls by ocean container ships are made mainly at Gdansk. Shipments from Asia usually reach Szczecin and Gdynia via transhipment in Hamburg, Bremerhaven, Rotterdam or Gdansk, where a smaller feeder vessel takes them on. Transhipment adds a few days, but for a consignee in western Poland Szczecin is often closer than Gdansk anyway, which shortens the road leg.
The route through the Suez Canal and around Africa
The classic route from Asia to Europe runs through the Strait of Malacca, the Indian Ocean, the Red Sea and the Suez Canal. Since the turn of 2023 and 2024, after attacks on merchant ships in the Red Sea, carriers have been routing most services around the Cape of Good Hope. That means several thousand nautical miles more, usually 10-14 extra days at sea, because the ship sails around the whole continent. This is why older guides that quote 30 days now describe the optimistic scenario.
Direct sailing versus sailing with transhipments
A carrier’s schedule shows both the transit time and the number of port calls on the way. A vessel that calls at several more terminals in Asia after leaving Shanghai will reach Europe later than a direct service, even if it sails earlier. When comparing offers for sea freight from China, ask about the place of transhipment and the estimated time of arrival at the destination, not just the sailing date.
How long a container from China takes - FCL versus LCL groupage
Delivery time also depends on the type of shipment you choose. A full container (FCL) is sealed at the supplier and travels straight to the destination. Groupage cargo (LCL) first goes to a consolidation warehouse, where it waits for other shippers’ goods, and after arrival it is unloaded at a deconsolidation point.
- Full container FCL shorter time, fewer handlings, lower risk of damage. It usually pays off from a dozen or so cubic metres or for heavy cargo such as stone.
- LCL groupage you pay for the space you use, but consolidation and deconsolidation usually add 1-2 weeks.
- 20′ container for heavy goods with stone slabs and blocks, weight decides, not volume. A twenty-footer reaches its weight limit before it runs out of space.
What makes transport from China to Poland take longer
Even a well-planned sea import from China carries a few constant risks. Most of them can be foreseen and built into the order schedule.
Chinese New Year and Golden Week
Chinese New Year falls between late January and mid-February. Factories usually stop for 2-4 weeks, and a few weeks beforehand every exporter wants to ship their orders, so space and equipment run short. Shipping in this period is often noticeably more expensive. Golden Week at the beginning of October has a similar, shorter effect. An order placed in December with a deadline “after New Year” will realistically reach Poland in March or April.
Congestion and cancelled sailings
When demand is weak, carriers cancel individual sailings (blank sailings), and when it is strong, cargo waits for the next free slot. On top of that come congestion in transhipment ports, storms and strikes. Such delays rarely exceed a week or two, but with seasonal products they can make or break sales.
Documents and clearance
A missing certificate of origin, a wrong value on the invoice or an unclear description of the goods will hold a container at the terminal, and waiting costs money. Once the free days are exceeded, the terminal charges storage and the carrier charges detention for its equipment. We describe the procedure itself in our post customs inspection step by step.
How to shorten delivery time from Asia
The importer has no influence on how long the voyage takes, but does have influence on the other stages. Most days can be won back in preparing the loading and in the formalities in Poland. In import logistics, these are exactly the stages that most often go off track.
- Ready date in the contract write a specific date, not “about a month”, and confirm it before booking.
- Booking in advance before New Year and in peak season, book space 3-4 weeks before the planned loading.
- Documents before arrival the invoice, packing list, bill of lading and certificate of origin should reach the agency before the container ship arrives in Europe.
- One forwarder for the whole route when freight, formalities and delivery are organised by one company, you do not lose days passing papers between parties.
- Closer to the consignee for a plant in western Poland, the port of Szczecin shortens the road leg, even with a transhipment.
We describe how to organise the whole process, from choosing the Incoterms rule to booking the container, in our guide how to organise sea transport.
Costs of sea freight from China
Freight rates change from month to month, so we do not quote amounts here that would be out of date in a few weeks. The price is made up of ocean freight, fuel and seasonal surcharges, terminal handling charges at both ends, feeder transhipment, the import declaration, duty and VAT, and delivery. How these costs are split between seller and buyer depends on the Incoterms rule in the contract, for example FOB or CIF. We prepare a quote for a specific shipment based on its weight, dimensions and place of loading.
Sea freight from China through Szczecin
We organise sea transport and ocean freight forwarding, i.e. complete transport from China to Poland: from the port in Asia to Szczecin and on to the consignee’s address. We book space and keep an eye on transhipment dates, and our customs agency prepares the import declaration before the container comes off the vessel. From the port we organise delivery by road transport to the address you specify. We also handle imports of natural stone, i.e. the carriage of heavy goods that require careful planning of the container and of securing the load.
Write to us with the place of loading, the type of cargo and its approximate weight. We will prepare a quote and a realistic delivery schedule.
Frequently asked questions
How long does a ship from China to Poland take?
The voyage itself usually takes 35-50 days, depending on the route and the number of port calls. The whole delivery from factory to consignee usually takes 6-9 weeks.
How long does a container from China to Szczecin take?
Usually 40-55 days from sailing, because transhipment in Hamburg, Bremerhaven, Rotterdam or Gdansk is added to the ocean voyage.
How long does groupage from China take?
LCL groupage usually takes 1-2 weeks longer than a full container, because it waits for consolidation and deconsolidation.
When should you order before Chinese New Year?
Early enough for the cargo to sail at least 2-3 weeks before the holiday. After that, factories stop producing and freight becomes more expensive.
What delays imports from China the most?
An order that is not ready at the supplier, lack of space in peak season, transhipments and incomplete documents.